May 17, 2012


Font Size


         Subscribe in NewsGator Online   Subscribe in Bloglines  

The Business of School Building Construction

Nov 1, 2011 12:00 PM, By Charles Praeger

Education institutions can control cost variables by considering metal building systems.

Columbus Middle School, Columbus, Miss., is a 150,515-square-foot clear-span project composed of seven metal buildings. 
The buildings radiate from a rotunda “hub.”

Columbus Middle School, Columbus, Miss., is a 150,515-square-foot clear-span project composed of seven metal buildings. The buildings radiate from a rotunda “hub.”

Many people in a community think of education only in the context of learning. But whether a school is public or private, coed or single-sex, urban or rural, affluent or struggling, education is a business. The business isn’t necessarily focused on profitability like the corporate sector, but large operating and capital budgets are needed for salaries, equipment, improved technology, programs and building operations. Costs for these variables will continue to rise, so school officials must control what costs they can.

Cost savings begin by building wisely. One option to consider is a metal building system. Architects have uttered phrases similar to this to many school officials and communities, and some architects have been laughed at because of negative notions about metal buildings. Many think metal building systems are what Farmer Tom should add to his property to control costs, not what a school system needs.

Misconceptions and Reality

If education institutions look past some of the misconceptions about metal building systems, they might find a solution for the next school project:

•Misconception: Metal buildings aren’t customizable. The base of a metal building system is a high-performance, flexible structural steel frame. This frame bears the load of a building, so the exterior finish actually is customizable with a variety of materials. Aesthetics and local codes can dictate the selection of wood, glass, brick, masonry, exterior insulated finishing system (EIFS) or factory-insulated panels.

•Misconception: Conventional building is more economical. Metal buildings systems may be less expensive because they can be purchased from a single-source supplier. A metal building from a single source may offer faster, consistent and more efficient construction and lower life-cycle costs than traditional construction. In addition, savings are possible because metal buildings can be erected year-round without typical weather delays—and generally can be built in one-third the time of conventional construction. Weather doesn’t affect the ability to join the building system elements; metal buildings are fabricated in a plant for bolt-type construction at the site.

•Misconception: The look is a square, fixed, tin box. Computerized customization of materials enables a design to express the learning vision of each specific school. The inside of the building is equally customizable because metal building systems can be expanded easily. Clear spans make possible large spaces such as pools, gyms, atrium spaces and auditoriums. Education institutions can add or reconfigure large assembly areas as needs and campus populations change.

•Misconception: Metal buildings are flimsy, drafty, non-energy-efficient structures. Many elements are available that can improve the strength and sustainability of metal buildings. Steel framing is a sustainable material with recycled content and recyclability at the end of its useful life. Because of this, it can receive LEED points and accreditation from other sustainability programs. The strength of steel also adds stability, fire resistance and a longer life to a building. If factory-insulated wall panels are chosen, they add energy-efficiency with their predetermined insulation R-values. A standard range is R-16 to R-32, so schools and universities have options to meet their specific needs.

An additional touch of sustainability can come via electricity cost savings realized through the use of skylights, clerestory windows and other natural light alternatives. These daylighting strategies help keep light fixtures turned off. Metal roofing is an additional upgrade option. Because of coating technology, cool metal roofs reduce the urban heat-island effect, have increased solar reflectivity and decrease energy consumption. Many metal roofs also are fire- and hail-resistant, and offer superior wind-uplift performance.


Acceptable Use Policy
blog comments powered by Disqus
Featured Story

Today's School Security

By Mike Kennedy

Improved technology and more effective prevention programs help schools and universities provide safer learning environments.

Contest

Learn more

OSRAM SYLVANIA presents the Great Lighting for Education Challenge

One lucky school will receive a full high-efficiency OCTRON® T8 classroom retrofit, including lamps, ballast, controls, fixtures and installation, a value of about $15,000. Learn more!

Spotlight On

Now Accepting Entries: Architectural Portfolio 2012

Entry forms due June 11. Click here for more information. 30th Anniversary Special for multi-page entries!

2012 Calendar of Industry Events

From SchoolDesigns.com and American School & University. Download it now!

AS&U 100

American School & University highlights the largest 100 school districts each September. Who's growing and who's slowing?


See the new and improved American School & University Buyer's Guide

AS&U's Online Buyers' Guide

Online Buyers' Guide

Find manufacturers and suppliers of products and services for education facilities, business and operations, including:

More Categories

Back to Top

Browse Back Issues

April 2012 issue of American School and University March 2012 issue of American School and University February 2012 issue of American School and University January 2012 issue of American School and University December 2011 issue of American School and University November 2011 issue of American School and University October 2011 issue of American School and University September 2011 issue of American School and University August 2011 issue of American School and University
BROWSE BACK ISSUES