May 16, 2008

Font Size


         Subscribe in NewsGator Online   Subscribe in Bloglines

Facility Planning: Add, Convert or Build?

Jun 1, 2006 12:00 PM, By James E. Rydeen

One of the more difficult issues facing schools and universities is whether to build a new school or upgrade an existing facility.

Many schools need to be replaced because of poor conditions. Yet, institutions have to consider other issues, such as decreasing enrollments; antiquated, small schools that are inefficient to staff and operate; and converting a building for other uses.

Making the right choice may be difficult to determine because of other concerns: changing educational philosophies, programs and delivery methodology, future mandated programs, and enrollment.

What are the factors that enable some schools to make wise facility decisions? Leadership, trust, confidence, continuity, communication, public relations and justification are important. The administrative team can provide strong leadership that creates trust and confidence; however, because administrators no longer spend the bulk of their careers with one district or institution, continuity and trust may be lacking.

Usually, administrators, planners and architects work together to identify facility needs. Sometimes, these needs already have been identified. Once that has been done, the community needs to be convinced. Involving the community in planning groups helps educate constituents. They should be informed through continual communication.

A comprehensive facility study can provide the facts to justify a project. Among those facts:

  • The educational adequacy of the existing facilities to adapt to and accommodate new educational philosophies, curriculums, programs, class sizes, scheduling, delivery methodology and community needs.

  • The physical adequacy of academic and non-academic support areas (media center, student commons, food service, and administration) to support increased enrollment.

  • The physical condition of materials and systems, structural integrity, code updating for energy conservation, ADA, fire, life safety and health, including mechanical, electrical and security systems.

  • A total cost analysis of new vs. renovation, value engineering, and life-cycle maintenance and operations costs.

  • The physical adequacy of a site to accommodate building expansions, additional physical education and athletic fields, more parking, and automobile and bus traffic patterns.

Continuing to expand a school may lead to problems. The institution may have outdated facilities that require expensive operations and maintenance. The lowest initial cost may be the most enticing, but it may not provide the most effective solution. Sentimental attitudes should not sway a decision that should be based on long-range facility needs.

Rydeen, FAIA, is an architect/facility planning specialist and former president of Armstrong, Torseth, Skold & Rydeen, Inc. (ATS&R), Minneapolis. He can be reached at Jrydeen@atsr.com.

Most Recent Story

Armed and Dangerous

Mike Kennedy

Just when you think you've heard everything! A lawmaker in Nevada plans to introduce a bill this month that would allow teachers to carry guns in classrooms. (Yes, you read that correctly.)

Most Popular Articles

Subscribe to RSS headline updates from:
Powered by FeedBurner

Essential Reading

The Subtle Stuff

Vikas Nagardeolekar and Edwin Merritt

It's hard to win passage of a school construction bond — whether through a citizen referendum or the vote of a town council or general town meeting.

Hear and Now

Michael McKeon and Lincoln Berry

When acoustics are mentioned with regard to schools, many people first think of performing arts.

Making it Readable

Peter Gisolfi

When my daughter was 10 years old, she left the comfort of her elementary school for the unfamiliar territory of the middle/high school building — a crazy quilt of pieces from the 1910s, 1930s, 1960s and 1970s.

Echo Boom Impact

Phillipe Dordai and Joseph Rizzo

Like their baby-boomer parents, the echo-boom generation is reshaping the college and university landscape.

Spotlight On:

Now Accepting Entries Architectural Portfolio 2008. Entry forms due June 3. VView more information on the 2008 Architectural Portfolio.

Top 10

How does your institution rank? Including enrollment and expenditures, growth rates and more!

AS&U 100

American School & University highlights the largest 100 school districts each September| Who's growing and who's slowing

Back to Top

Browse Back Issues

ASU May Cover ASU April Cover ASU March Cover ASU February Cover ASU January Cover ASU December Cover ASU November Cover
BROWSE BACK ISSUES