Facility Planning: Quality Control

Oct 1, 2004 12:00 PM, By James E. Rydeen

Changes are necessary during the construction phase of most projects. Problems can arise because of unforeseen conditions, building code interpretations or owner-instituted changes. Although much has been written about the design of educational facilities, little has been written about the importance of complete and accurate specifications and working drawings — construction documents that are the backbone of a project.

The specifications, or project manual, include the bidding requirements, contract conditions and the specifications that define the qualitative requirements for products, materials and workmanship.

The working drawings, or construction drawings — the blueprints — are used during construction. Drawings quantify materials, and illustrate location and relationship.

The National Council of Schoolhouse Construction (NCSC) Guide for Planning School Plants, published in 1965, discussed the principles of economy in planning and construction. Principle 7 still applies today:

“Experience has shown that the use of complete plans and specifications usually results in lower bids than plans judged incomplete for other work of comparable construction. Contractors are able to figure their costs more accurately, eliminating the need to pad their bids to assure themselves of adequate contingencies.”

A well-documented, accurate and complete set of drawings and specifications can result in competitive bids with lower costs, sometimes by as much as 10 percent.

So what has created this problem of incomplete documents? Multiple forces could be at play:

  • Society expects instant response and gratification.

  • Education administrators do not allow enough time for architects and engineers to prepare accurate drawings and specifications.

  • Construction managers and design/builders put unrealistic expectations on architects regarding the time needed to produce accurate drawings and specifications.

  • Architects produce incomplete construction documents because they do not allow or are unwilling to request enough time.

  • Architects promise impossible schedules in order to be selected.

Even with computer-aided design and construction detailing, it still takes time to prepare a one-of-a-kind building. Haste in preparation and lack of time to perform a document check adequately will create problems during the bidding and construction phases. A team needs time to check, cross-check and coordinate all aspects of the drawings including architectural, structural, civil, landscape architecture, interior design, mechanical, electrical, technology and security of the drawings. Changes during the construction phase are more expensive than if the items had been part of the original bid.

Rydeen, FAIA, is an architect/facility planning specialist and former president of Armstrong, Torseth, Skold & Rydeen, Inc. (ATS&R), Minneapolis. He can be reached at Jrydeen@atsr.com.


Acceptable Use Policy
blog comments powered by Disqus
Featured Story

Today's School Security

By Mike Kennedy

Improved technology and more effective prevention programs help schools and universities provide safer learning environments.

Contest

Learn more

OSRAM SYLVANIA presents the Great Lighting for Education Challenge

One lucky school will receive a full high-efficiency OCTRONŽ T8 classroom retrofit, including lamps, ballast, controls, fixtures and installation, a value of about $15,000. Learn more!

Spotlight On

Now Accepting Entries: Architectural Portfolio 2012

Entry forms due June 11. Click here for more information. 30th Anniversary Special for multi-page entries!

2012 Calendar of Industry Events

From SchoolDesigns.com and American School & University. Download it now!

AS&U 100

American School & University highlights the largest 100 school districts each September. Who's growing and who's slowing?

AS&U's Online Buyers' Guide

Online Buyers' Guide

Find manufacturers and suppliers of products and services for education facilities, business and operations, including:

More Categories

Back to Top

Browse Back Issues

April 2012 issue of American School and University March 2012 issue of American School and University February 2012 issue of American School and University January 2012 issue of American School and University December 2011 issue of American School and University November 2011 issue of American School and University October 2011 issue of American School and University September 2011 issue of American School and University August 2011 issue of American School and University
BROWSE BACK ISSUES