May 21, 2008

Font Size


         Subscribe in NewsGator Online   Subscribe in Bloglines

Know-How: Roofing

Feb 1, 2006 12:00 PM, By Mike Kennedy

As winter nears an end, school maintenance workers begin turning their attention to spring-cleaning tasks. High on the list should be roof inspections — especially in those areas where the roofs have endured a harsh winter.

Although not all schools and universities have the maintenance staff to carry out semi-annual inspections of all their buildings, roofing experts say that should be the goal for education institutions.

The best time for maintenance workers to get up on the roof and do those inspections is in the spring and in the fall.

All roofing deteriorates eventually, but schools that conduct regular inspections are more likely to see their roofs reach their expected life span. Effective inspections will enable workers to discover obvious signs of trouble, such as standing water, that can't be detected without getting a close-up look.

A close inspection also can reveal early signs of damage and decay that can be repaired before too much water and moisture can seep undetected into a building. Unchecked leakage can lead to mold growth and structural deterioration that can exacerbate damage to a facility.

The Chicago public school system, with more than 600 schools and about 425,000 students, urges its maintenance staff to inspect roofs twice a year.

“Semi-annual roof inspections and maintenance can substantially increase the useful life of the roof,” the district states in a facility operations bulletin.

“It can prevent serious interior and exterior damage to the buildings. And it will reduce many of the roof problems that occur with winter freeze and thaw conditions.”

The school system spells out a five-step process for inspections:

  • Remove all the debris, old equipment and soil buildup around the drains. Scupper wells, drain covers, overflows and the areas around these items must be clean to allow the proper drainage of all roof water.

  • Walk the perimeter of the roof and inspect the parapet capstones or tiles to see that they are in good condition with the joints well-sealed. Open joints, or cracked stone or tile can lead to rapid deterioration of the parapet walls and roof flashings.

  • Inspect the flashing where it's attached to the brickwork and overlaps the roofing material. Areas where the roof mastic has separated from the flashing or brickwork should be repaired immediately to eliminate water infiltration under the roof membrane. The repair can be done at the time of the inspection using common roof cement or mastic.

  • Inspect all the equipment flashings, vent flashings, conduit penetrations, fixture mountings and roof hatch openings to see if the roof mastic has been damaged.

  • Walk the remaining open portions of the roof; note any soft or ballooned areas that may require venting, and request repairs from the appropriate department.

NOTABLE

36

Percentage of K-12 schools renovated in 2004 that included roof upgrades.

25

Percentage of higher-education institutions renovated in 2004 that included roof upgrades.

Source: American School & University, “31st Annual Official Education Construction Report,” May 2005.

Most Recent Story

Armed and Dangerous

Mike Kennedy

Just when you think you've heard everything! A lawmaker in Nevada plans to introduce a bill this month that would allow teachers to carry guns in classrooms. (Yes, you read that correctly.)

Most Popular Articles

Subscribe to RSS headline updates from:
Powered by FeedBurner

Essential Reading

The Subtle Stuff

Vikas Nagardeolekar and Edwin Merritt

It's hard to win passage of a school construction bond — whether through a citizen referendum or the vote of a town council or general town meeting.

Hear and Now

Michael McKeon and Lincoln Berry

When acoustics are mentioned with regard to schools, many people first think of performing arts.

Making it Readable

Peter Gisolfi

When my daughter was 10 years old, she left the comfort of her elementary school for the unfamiliar territory of the middle/high school building — a crazy quilt of pieces from the 1910s, 1930s, 1960s and 1970s.

Echo Boom Impact

Phillipe Dordai and Joseph Rizzo

Like their baby-boomer parents, the echo-boom generation is reshaping the college and university landscape.

Spotlight On:

Now Accepting Entries Architectural Portfolio 2008. Entry forms due June 3. VView more information on the 2008 Architectural Portfolio.

Top 10

How does your institution rank? Including enrollment and expenditures, growth rates and more!

AS&U 100

American School & University highlights the largest 100 school districts each September| Who's growing and who's slowing

Back to Top

Browse Back Issues

ASU May Cover ASU April Cover ASU March Cover ASU February Cover ASU January Cover ASU December Cover ASU November Cover
BROWSE BACK ISSUES