A Modest Pullback: 8th Annual College Maintenance and Operations Cost Study

Apr 1, 2002 12:00 PM, Joe Agron

Editor's note: To view the charts and graphs that accompany this article, click HERE. Requires Adobe Acrobat Reader.)

The economic downturn has taken its toll on college maintenance and operations (M&O) budgets, reversing an upward trend over the past few years in the amount 2-year and 4-year institutions allocated to M&O as a percentage of total budget.

M&O spending as a percentage of total budget dropped to 10 percent from 10.5 percent a year ago, according to American School & University's eighth annual College Maintenance and Operations Cost Study. While the downward move is not major, it does come at a time when construction spending at higher-education institutions is booming.

Behind the survey

In January, physical plant directors at 2-year colleges and 4-year institutions with no significant graduate programs were asked to document various M&O costs for the 2001-02 school year. No universities were included in this research. The survey specifically targets 2-year colleges and 4-year institutions with no significant graduate programs in order to provide useful comparative data. Larger 4-year universities with significant graduate programs are not surveyed because their costs and activities are so varied that results would be less useful.

Of survey respondents, 51 percent were 2-year institutions, 45 percent 4-year and 4 percent gave no specification. In addition, 58 percent were public institutions and 42 percent private, while 58 percent listed their classification as urban, 13 percent suburban, 27 percent rural and 2 percent other.

Dissecting the data

Information for this year's M&O Cost Study is compiled in a variety of tables and charts detailing M&O expenditures at 2-year, 4-year and all colleges. Table 1 details M&O spending per full-time-equivalent (FTE) student for such categories as salaries, benefits, gas, electricity, other utilities, maintenance and grounds equipment and supplies, vehicle maintenance and total M&O, and identifies the percentage of total budget colleges allocate to M&O.

As in past surveys, 4-year colleges continue to spend considerably more per student for M&O than 2-year institutions. For the 2001-02 school year, 4-year colleges apportioned more than three-and-a-half times more per student ($1,777) than 2-year colleges ($496).

There are a number of reasons for the wide discrepancy in spending per student. The most obvious being 4-year colleges differ significantly in their educational mission and offerings to students. In addition, 4-year colleges typically have older physical plants; more specialized facilities and courses; housing; large-scale health and laboratory buildings; and 24-hour, year-round usage than 2-year institutions.

The largest portion of M&O dollars at colleges continues to go toward salaries and benefits, which represent 55 percent of the total budget. Two-year colleges spend 52 percent of their M&O budgets on salaries and benefits, while 4-year colleges apportion 58 percent.

Energy (gas and electricity) accounts for the second largest expenditure in M&O budgets (29 percent). Two-year colleges saw the biggest percentage increase in energy costs, jumping to 37 percent of the total M&O budget compared to 28 percent last year. Four-year institutions allocate 27 percent of their M&O budget to energy, down from 29 percent last year.

Additional costs

M&O expenditures per square foot of building maintained can be found in Table 2. Two-year colleges spend more per square foot on M&O than their 4-year counterparts ($4.10 versus $3.22). They also spend more per square foot on salaries, benefits and energy than 4-year colleges, but less on other utilities, and maintenance and grounds equipment and supplies.

Square feet of building maintained per FTE student varies significantly among 4-year and 2-year colleges. Four-year institutions maintain almost four times the amount of building space than 2-year colleges (492 square feet per student compared with 127 square feet per student at 2-year colleges). The median college maintains 213 square feet per student.

Table 3 features salary data for a variety of M&O job functions at 2-year, 4-year and all colleges. The titles surveyed include:

  • Administration: Those individuals who have managerial or supervisory duties (does not include the overall director of physical plant).

  • Clerical: Those individuals who perform secretarial duties.

  • Custodial: Those individuals responsible for building upkeep and cleaning.

  • Engineer/Architect: Those in-house positions responsible for planning, design and specialized facilities duties.

  • Grounds: Those individuals responsible for landscape maintenance and upkeep.

  • Maintenance: Those individuals who perform skilled jobs, such as plumbing, electrical or HVAC repair.

  • Motor Pool: Those individuals involved with transportation operations.

  • Security: Those individuals responsible for safety of buildings and equipment. Does not include professional security or law-enforcement officials, if employed by the college.

Among other survey findings:

  • The amount of square feet maintained per custodian at all colleges equaled 32,750. Square feet maintained per custodian at 2-year colleges topped 26,000, while custodians at 4-year institutions maintained 35,584 square feet each.

  • Square feet maintained per maintenance worker equaled 62,368 at all colleges, 57,243 at 2-year institutions and 72,778 at 4-year colleges.

  • Acres maintained per grounds employee equaled 21 at all colleges, 32 at 2-year institutions and 18 at 4-year colleges.

  • The median M&O budget at all colleges for the 2001-02 school year was $1.67 million, $1.46 million at 2-year institutions and $2.13 million at 4-year colleges.

Agron, editor-in-chief, can be reached at jagron@primediabusiness.com


Acceptable Use Policy
blog comments powered by Disqus
Featured Story

Today's School Security

By Mike Kennedy

Improved technology and more effective prevention programs help schools and universities provide safer learning environments.

Contest

Learn more

OSRAM SYLVANIA presents the Great Lighting for Education Challenge

One lucky school will receive a full high-efficiency OCTRONŽ T8 classroom retrofit, including lamps, ballast, controls, fixtures and installation, a value of about $15,000. Learn more!

Spotlight On

Now Accepting Entries: Architectural Portfolio 2012

Entry forms due June 11. Click here for more information. 30th Anniversary Special for multi-page entries!

2012 Calendar of Industry Events

From SchoolDesigns.com and American School & University. Download it now!

AS&U 100

American School & University highlights the largest 100 school districts each September. Who's growing and who's slowing?

AS&U's Online Buyers' Guide

Online Buyers' Guide

Find manufacturers and suppliers of products and services for education facilities, business and operations, including:

More Categories

Back to Top

Browse Back Issues

April 2012 issue of American School and University March 2012 issue of American School and University February 2012 issue of American School and University January 2012 issue of American School and University December 2011 issue of American School and University November 2011 issue of American School and University October 2011 issue of American School and University September 2011 issue of American School and University August 2011 issue of American School and University
BROWSE BACK ISSUES