Longmeadow (Mass.) district studies future of high school

From The Springfield Republican: The Longmeadow (Mass.) School Building Committee will conduct a feasibility study to determine whether Longmeadow High School should be rebuilt or renovated. Community members will gather with an educational planning and visioning specialist to brainstorm ideas about the type of high school the town wants.The architect conducting the study is the Office of Michael Rosenfeld.

Discuss this Article 0

Post new comment
Sign In or register to use your American School & University ID
(optional)
Get education facilities news, trends and research.
Visit Schoolhouse Beat on Twitter

Newsletter Signup

2013 Calendar of Industry Events
2013 Calendar of Industry Events

From American School & University and School Designs

Download It Now!

 
Connect With Us