Jul 1, 2004 12:00 PM, Mike Kennedy

Schools and universities should be vigilant about upgrading their facilities to correct indoor-air-quality problems. But in some cases, renovations and retrofits themselves can be the cause of poor air quality.

The U.S. Environmental Protection Agency's “Indoor Air Quality Tools for Schools” program provides guidance for facilities managers upgrading their buildings:

  • Before performing any demolition, check for lead-based paints and asbestos.

  • When possible, perform work at times when the occupants are not in the building, such as vacation breaks, weekends or evenings.

  • Keep building occupants as far as possible from renovation activities. The greater the distance between pollutants and occupants, the less concentrated the pollutants will be upon reaching the occupants.

  • Install temporary barriers (such as plastic sheeting) to seal the work areas from the occupied areas. Cover all supply and return air grilles if the HVAC system in the renovation area also serves occupied areas. This will prevent the air ducts from spreading pollutants to occupied areas. Exhaust air from the construction area so that pollutants cannot flow from the construction area to the occupied areas.

  • Try to keep pollutants confined to as small an area as reasonably possible, rather than allow them to spread to larger areas.

  • When painting, select a low-VOC-emitting paint that is free of lead and mercury. Use proper storage and disposal practices for paints, solvents and supplies. Allow paint odors to dissipate before occupants return to the area; use supply and exhaust fans to sweep fumes out of the building.

  • For flooring installations, use low-emitting flooring materials and adhesives. Let the new flooring air out before installing it. Install carpet, vinyl and related flooring materials when the school building is not in use, and follow the manufacturers' recommendations for ventilating the work area. Seal joints of hard surfaces and the entire surface of porous flooring installed near water sources.

  • When upgrading roofs, put “hot pots” of tar and other pollutant-producing materials away from outdoor air intakes. Consider wind patterns and try to arrange equipment so that winds carry odors away from the building. If the pollutants can't be kept away from air intakes, schools may choose to temporarily close the outdoor air intakes of air handlers, particularly rooftop units in the vicinity of (and downwind from) the work area. In these cases, schools should provide a temporary solution (such as fans) to supply unaffected outdoor air, and reduce pollutant-generating activities indoors.

  • Clean up construction debris, dust and scraps at least daily so that there is less chance that these pollutants will enter occupied areas.

NOTABLE

15,000

Estimated number of U.S. schools that have indoor air quality or ventilation problems.

Source: U.S. General Accounting Office

1,300

Number of hours a typical student spends in a school building each year.

Source: EPA

14 MILLION

Number of school days lost each year to asthma-related absences.

Source: Centers for Disease Control

15

Amount of cubic feet per minute (cfm) per person that is the outdoor air ventilation rate recommended for classrooms.

Source: American Society of Heating, Refrigerating, and Air-conditioning Engineers


Acceptable Use Policy
blog comments powered by Disqus
Featured Story

20th Annual Residence Hall Construction Report

By Joe Agron

Even in difficult economic times, colleges and universities continue to invest in residence hall construction projects…

Register to view the Green School & University: A Virtual Conference & Expo on demand

Essential Reading

The Subtle Stuff

Vikas Nagardeolekar and Edwin Merritt

It's hard to win passage of a school construction bond — whether through a citizen referendum or the vote of a town council or general town meeting.

Hear and Now

Michael McKeon and Lincoln Berry

When acoustics are mentioned with regard to schools, many people first think of performing arts.

Making it Readable

Peter Gisolfi

When my daughter was 10 years old, she left the comfort of her elementary school for the unfamiliar territory of the middle/high school building — a crazy quilt of pieces from the 1910s, 1930s, 1960s and 1970s.

Echo Boom Impact

Phillipe Dordai and Joseph Rizzo

Like their baby-boomer parents, the echo-boom generation is reshaping the college and university landscape.

Featured Webinar

Achieving Digital Printing Goals in Challenging Economic Times

Learn about ways to reduce your carbon footprint, save money, lessen risk and get the most from your printing solution.

More Webinars

Featured White Paper

Enhance Communication Effectiveness on Your Campus

Read how a campus migrated to a digital two way radio system to enhance their ability to communicate clearly and securely throughout their campus.

More White Papers

Spotlight On:

Still Accepting Entries: Architectural Portfolio 2009

Visit SchoolDesigns.com to enter before the August judging. Includes free publication in Green Field Notes 2009 in the Architectural Portfolio issue.

The Top 10 Lists

How does your institution rank? Including enrollment and expenditures, growth rates and more!

AS&U 100

American School & University highlights the largest 100 school districts each September. Who's growing and who's slowing?

Latest Jobs

Back to Top

Browse Back Issues

June 2009 issue of American School and University May 2009 issue of American School and University April 2009 issue of American School and University March 2009 issue of American School and University February 2009 issue of American School and University January 2009 issue of American School and University December 2008 issue of American School and University November 2008 issue of American School and University October 2008 issue of American School and University
BROWSE BACK ISSUES