Construction is underway on the Dr. Phillips High School campus renovation and expansion project for (OCPS), situated in the Dr. Phillips area of Orlando.
The design includes a new two-story classroom building, and a new visual and performing arts addition to the existing theater building. The addition will incorporate a black-box theater, and labs for dance, graphic arts, digital recording studios and music. The renovated campus will have a new community image with renovations to the administration and gym buildings, as well as enhancements to the onsite vehicular and pedestrian traffic patterns that will provide a safer campus experience.
The project, which will be completed in phases, is anticipated to be complete in 2015.
C.T. Hsu + Associates (Orlando) is architect for the project. The contractor for the project is James A. Cummings, Inc.